Your language:

Aker Shpitsbergen

In 2009 Bars Elekter participated in execution of Aker Shpitsbergen project.
Total amount of working hours spent on this project is 11500.


Design:Aker H-6e, Aker Solutions
Year Built:2009  (Aker Group at the Verdal, Norway shipyard)
Classification:DNV 1A1, Column Stabilized Drilling Unit (N), DRILL (N)
Water Depth:3,000 m (design depth)
Drilling depth:10,000 m
Helicopter Deck:Sikorsky S92 and S-61N, Superpuma AS332L2.
Type:Double Ram RigĀ® by Aker Solutions
Accommodation:140 single bed cabins, extendable to 160
Owner:Aker Drilling A/S